Warkworth Satellite Station
CLIENT
Kordia
LOCATION
North Auckland
EXPERTISE
Infrastructure Construction
VALUE
$300,000
PERIOD OF CONSTRUCTION
This project was completed in 6 Months.
Key Performance Indicators:
N.cole installed ten 900mm in situ piles, designed and built the framework and sourced a bespoke fly-ash concrete to reduce concrete friction heat for the pour. We also coordinated a complex structural hold-down bolt template to receive the six legs of the satellite. These consisted of engineered feet to withstand concrete pressures during the mass pour and an intricate service duct suspended mid-slab. As usual, the works were completed on time and on budget. p